The Club Lions d’Earlton, the Fondation communautaire du Témiskaming & the Club d’Âge d’Or are now the proud owners of the building that formerly housed the village grocery store (Grocery King). François Gauthier, President of the Board of Directors carves a key for the new Coeur du Village.

01 clé

The architectural plans are approved by the engineers and the municipality of Earlton.

01aPlan Exterieur

As the old structures are demolished, volunteers salvage whatever they can to save costs.

01c Recuperation des cables

Volunteers are preparing the new space, including exterior framing, wall and ceiling insulation.

03 mur exterieur 02 prep espace 05 insulation 04 Mur

Volunteers are putting up the interior walls. Watch out, Michel Léveillé has his nail gun!

Gerry Gravel, Léo Rivard and Michel Léveillé take a coffee break after mounting the kitchen wall.

The 2nd floor wall is now nailed.

06 Premier Mur 07 Mur de la cuisine 08 Mur du 2e etage 09 mur du bureau

The wall for the future Club Lions d’Earlton office is up.

The floor is cut out for plumbing.

10 Fosse

Francois Gauthier gets comfortable in the pit.

11 Francois dans la fosse

The pipes are installed and the trench is covered.

12 Tuyaux

2021

First meeting of the Fondation communautaire du Témiskaming at Coeur du Village, while under construction! From left to right: Michel Léveillé, Charlotte Lavictoire, Pierre Bélanger, Sylvie Boileau and Debbie Demers.

13 le CA

A well-deserved coffee break for the volunteers! From left to right: Michel Léveillé, Denis Labonté, Claude Boileau, Gerry Gravel, Bruno Gauthier, Lilliane Brazeau, M. Leblanc, Rosanne Perreault, Lucien Beaudry and Robert Léveillé (and François Gauthier behind the camera).

14 Les benevoles

Electrical work begins.

14 Electricite

The wires to the panel.

15 panneau electrique

The wires are well strung.

16 Cable bien corder

First delivery of gypsum boards.

17 Gyproc

The walls and ceiling are closed.

18 Mur Plafond

Bruno Gauthier wonders if he screwed enough screws

19 Bruno

Openings are cut and windows are installed.

20 Fenetre 21 Fenetres

Volunteers go back to childhood and break the windows of the old grocery storefront. They then barricade the openings until the new windows are installed.

22 brise fenetre 23 barricade24 facade CdV

The support beam is delivered and installed.

25 poutre 26 poutres 27 poutres 28 poutres

Another big step, the doors are delivered!

29 porte livraison 30 Porte simple 31 portes doubles

The walls are prepared for the plasterer.

34 mur platre 32 Prep murs 33 mur platre

Finally, we add some color!

Some of the painters: Guy Gravel, Lyne Turcotte, Lionel Rivard, Michel Léveillé and Marielle Beaulac.

35 Peinture 36 Peinture 37 Peinture 38 peinture

Not easy on the knees installing new floors!

39 plancher 40 plancher

2022

The volunteers are starting to see the light at the end of the tunnel… after 2 years of effort!

41 Finition 42 Finition 43 Finition 44 Finition 45 Finition

The new Coeur du Village Board of Directors office. 

46 Bureau

Except for a few tables, everything is ready for a little shuffle board game in the Salle Franc-À-Mi!

47 Plancher Shuffleboard

The Salle Desjardins is ready for your meetings!

47a Desjardins

Our new professional kitchen is spacious and ready to prepare your meals!

48 Cuisine

All of the volunteers and the Board of Directors would like to thank our donors who have generously supported the Coeur du Village project from the beginning!

50 Donateurs Construction

The Coeur du Village is now proudly located in Earlton!

49 Enseigner CdV